-
Burton Wold
Burton Wold is a sold Muirhall Energy development, comprising 3 135 m turbines.
-
Climpy
Climpy is a sold Muirhall Energy development, comprising 1 99 m turbine.
-
Crossdykes
Crossdykes is a sold Muirhall Energy development, comprising 10 176.5 m turbines.
-
Glen Ullinish
Located in Skye, this 49.9 MW development comprising 11 turbines was granted consent in December 2021.
-
Glen Ullinish II
This 217.8 MW proposed development, comprising 33 turbines, is situated between Portree and Dunvegan on the Isle of Skye.
-
Greengairs East
This 8 turbine development, located between the villiages of Greengairs and Caldercruix in North Lanarkshire, became fully operational in June 2023.
-
Heathland
Heathland is a sold Muirhall Energy development, comprising 1 99m turbine.
-
Hopsrig
The proposed 12-turbine development is situated 7.5km from Langholm and if granted consent, will have a total generating capacity of 80MW.
-
JJ's Farm
JJ's is a sold Muirhall Energy development, comprising 1 99m turbine.
-
Loch Caroy Quayside
Muirhall Energy is proposing to construct a quay on the eastern shoreline of Loch Caroy to accommodate the delivery of turbine components closer to Glen Ullinish Wind Farm Site Access.
-
Loganhead
This 53 MW proposed development, comprising 8 turbines, is situated South-West of the village of Bentpath in Dumfries and Galloway.
-
Muirhall
Muirhall Wind Farm comprises 6 turbines is located at Stallashaw Moss, in South Lanarkshire