Tormywheel
Tormywheel Wind Farm was commissioned in March 2017, and was subsequently sold in September 2017.
Before the development was sold, Muirhall Energy secured a Community Investment Fund of £5,000 per MW per year to be paid to the local community for the lifetime of the project.
15
Turbines
111 m
Maximum Tip Heights
30 MW
Generating Capacity