Burton Wold
Burton Wold Wind Farm was commissioned in March 2017, and was subsequently sold in June 2020.
3
Turbines
135 m
Maximum Tip Heights
8.25
Generating Capacity
Burton Wold Wind Farm was commissioned in March 2017, and was subsequently sold in June 2020.
Turbines
Maximum Tip Heights
Generating Capacity