Tormywheel

Status

Operational since March 2017.

News

For more Tormywheel news click here.

Downloads

Environmental Statement Non-Technical Summary (17.5MB).

Site Location Plan (5MB)

Output

15 Turbines = 2.05MW each
Total Installed Capacity = 30.75MW

Specifications

Height to blade tip = Up to 111m

The Development

Tormywheel is an operational 15 turbine south west of Breich, West Lothian.  The site was acquired in the latter part of 2015 and Muirhall Energy are managing the operation of the project. The development supplies 24,816 local homes, based on average electricity consumption in West Lothian.

Community Benefit

Muirhall Energy has set up a Community Benefit Fund and has engaged with residents on the distribution of this. A fixed annual payment of £5,000 per megawatt (MW) of installed capacity will be provided, index-linked to account for inflation. This amounts to approximately £150,000 per annum, or £3.75 million over the 25 year lifetime of the proposed development.

 

Tormywheel Photomontage

Subscribe to our newsletter for updates and industry news: