Climpy

Climpy Proj Stats 500Status

Application consented 27 March 2012

Downloads

Site Location Plan (1.1MB)

Output

Total development capacity = 500kW
Feed in Tariff Project

Specifications

Turbine = Enercon E53
Height to blade tip = 101m
Rotor diameter = 56m
Hub Height = 73m

Benefits

Contribution to Local Council Renewable Energy Fund = £5,000 annually (4x the renewable fund contribution)
CO2 displacement = 276 homes annually

 

Climpy Turbine

Subscribe to our newsletter for updates and industry news: